Catalyst Concrete

Catalyst Concrete

Bristlecone Construction Structures division completed 30,000 sf of foundations for two buildings on caissons, one that has a structural steel frame and one that is precast concrete - topping slabs on both.

The contract value was $3,000,000.

Alto Concrete

Alto Concrete

IMG_0173.JPG

Bristlecone Construction Structures division completed the 46,000sf post tension podium for Swinerton Builders. The foundation system is caissons with grade beams walls columns and some structural slabs on void.

The contract value was $2,200,000.

Sloan's Lake Flats

Sloan's Lake Flats

Bristlecone Construction Structures division completed turnkey concrete construction of a 17,000 sf two story podium for a new multi-family development in Denver, CO.

The contract value was $1,760,000

Market Center Renovation Phase 1

Market Center Renovation Phase 1

As the General Contractor, Bristlecone Construction was responsible for the demolition of the existing spaces in order to accept TI work. The historic renovation project included: New historical storefront, structural floor infills to add square footage to retail space, new grease duct for existing restaurant and new shaft to the roof with fan.  In addition, all new electrical gear and connections serving the buildings was installed. 

Phase 1 took five months to complete. 

Crossing at Sloan's Lake

Crossing at Sloan's Lake

IMG_0147.JPG

Bristlecone Construction Structures division completed turnkey concrete for a 15,000 sf one level podium for a new multifamily development in Denver, CO.

The contract value was $1,044,000.

The Alley and Bristlecone Office Renovation

The Alley and Bristlecone Office Renovation

Bristlecone Construction was responsible for the complete demolition and complete renovation of a 4,000 square foot historic building in the heart of downtown Littleton.

The existing building was divided into two spaces, one side housing a restaurant and the other housing an office space. 

The project took 12 weeks to complete.

DU Apartments

DU Apartments

Bristlecone Construction was selected by Dublin Development to construct the new, 5-story, $11m apartment complex in Denver, CO.

Harvard Square Porte Cochere

Harvard Square Porte Cochere

harvardsmall.jpg

Bristlecone Construction was responsible for the removal and replacement of the entryway of the existing Assisted Living Facility at Harvard Square to match the architecture of the newly constructed Memory Care Facility at the same location. 

The new porte cochere is a large rough-frame timber structure with stucco and stone veneer accent.

The 4,000 square foot project was completed in three months.

Kobold Renovation

Kobold Renovation

Bristlecone Construction was the general contractor for the TI project turning an existing building into a new Urgent Care facility with retail space. 

 

Kestrel Concrete

Kestrel Concrete

Bristlecone Construction provided concrete services for Milender White for the 500’ retaining wall on footings and caissons, crane pad for a new Senior Living Facility. 

Welborn House Renovation

Welborn House Renovation

Bristlecone Construction recently completed the framing renovation for Fransen Pittman for the Welborn House, an iconic structure on the Colorado Academy Campus. The Bristlecone Structures department was responsible for the addition and exterior renovation of the 120 year old administrative building used to house alumni operations, admissions office, ballroom and classroom. The project took one month to complete.

Ogden Street Flats

Ogden Street Flats

IMG_0133.JPG

Generation Development’s latest project is a 29-unit, new luxury apartment building 1300 N. Ogden, Denver, CO. The project will integrate the existing  1930’s car shop with the new structure.

This project will feature a 5-story luxury podium structure mixing one, two and three bedroom for sale condominiums. The largest unit will be 2,400 square feet.

Special project features include:
- Rooftop deck
- Existing garage will turn into a parking garage
- Wood framed construction with metal panel siding and stucco
- Top is the penthouse with high end finishes

Bristlecone Structures will complete concrete and framing for the project in addition to providing General Contracting Services.

 

City of Lakewood Founders Park Renovation

City of Lakewood Founders Park Renovation

Bristlecone Construction demolished the existing playground within an open park space in Lakewood, Colorado. The project included importing and exporting of soils, expansion of the existing playground to 20,000 sq ft., installation of two new playground systems (one for 8+ years and one for 8 years and under), installation of a half-court basketball court.

Architectural seating, landscaping, pre-manufactured shelter and a grilling area were important to the City of Lakewood.

The project took 60 days to complete. 

Presbyterian St. Luke's

Presbyterian St. Luke's

Bristlecone Structures recently completed foundation work for a variety of projects for Layton Construction at Presbyterian St. Luke's Hospital in Denver, Colorado. Concrete work included mat slabs for equipment, slabs on grade, slabs on deck and equipment pads.

Crossing at Sloans

Rendering courtesy of EV Studios

Rendering courtesy of EV Studios

Bristlecone Structures is performing the foundation and elevated post tension slab for this luxury condo project for Catamount Constructors. The project includes caissons, grade beams, concrete columns, and an elevated post tension slab.

Swedish Medical Center

Bristlecone Structures is performing the foundation for the new addition to Swedish Hospital for Layton Construction. Foundation includes caissons, grade beams, and a structural slab.

Cavalier Apartments

Rendering courtesy of Studio Architecture

Rendering courtesy of Studio Architecture

As the General Contractor for his project, Bristlecone Construction will renovate the existing 220-unit, 226-bed Cavalier Apartments in Boulder, Colorado and add another 96-beds.

The project cost is estimated at $9m and includes an extensive site package in addition to the renovation and a resort style club house and pool. This project is the latest development partnership with Brickstone Partners, Studio Architecture and Bristlecone Construction.

Eliot Street Apartments Concrete

As part of the Eliot Street Apartments project, Bristlecone Construction is constructing a below grade parking structure on caissons with two post tension slabs.  There is 25,000 of elevated deck on a postage stamp site including one siding concrete walls against beam and lagging shoring system in addition to two sided walls on caissons.

 

Warwick Hotel

warwick.jpeg.jpg

Bristlecone Construction is completing the renovation of this classic Denver Hotel for the Warwick International Hotel Corporation.  This project will completely update and revitalize the rooftop pool deck, part of the former Playboy Club.  The new pool will feature a state of the art stainless pool and will reconfigure the existing structure to accommodate the new pool.

 

Jefferson Park Apartments

Jefferson Park Apartments

Jefferson Park Apartments is an $11m, 72-unit, 5-story multifamily development within the proximity of the popular Highlands Neighborhood. Adams Development, a local residential and mixed use developer, alongside Bristlecone Construction is committed to creating creative living spaces and finishes unique to the market.
 
Featuring beam and lagging shoring for below grade parking structure, the first floor will feature high end retail with two additional floors of market rate apartments complete with a spectacular rooftop deck. This project features an almost full brick veneer façade with an extensive scaffolding package to keep the public safe in this downtown environment while keeping our crews productive.